Racking has three separate standards for three separate stages: EN 15512 for design, EN 15620:2021 for installation tolerances and clearances, and EN 15635 for use and maintenance. A rack can be correctly designed, badly installed, and then quietly damaged in service — each stage fails differently. This guide gives the actual tolerance values, a handover checklist, and the in-service duties that transfer to the warehouse owner the day we leave site.

What's in this guide

Which Standard Governs Which Stage

Confusion between these three documents causes most disputes about who should have caught a problem.

Standard Current edition What it governs
EN 15512 2020+A1:2022 Structural design of adjustable pallet racking
EN 15629 2008 The specification: what data the user must give the supplier
EN 15620 2021 Tolerances, deformations and clearances of the installed rack
EN 15635 2008 Application and maintenance — safe use, inspection, damage

EN 15629 is the one buyers overlook. It places a duty on the specifying side to supply building, floor, load, pallet and handling-equipment data. If the pallet weights or truck model given to us are wrong, the design is correct against wrong inputs. Garbage in is a specification failure, not a calculation failure.

EN 15635 does not contain structural calculations. It governs what happens after handover, and most of its obligations sit with the warehouse operator, not the supplier.

EN 15620:2021 Installation Tolerances

The 2021 edition replaced the 2008 version and removed the old Class 100 to 400 classification system. If a specification or a supplier's manual still quotes "Class 300 tolerances", it is referencing a withdrawn framework. Tolerances are now expressed directly by aisle type.

Values below are from EN 15620:2021 Tables 1 and 2. H is the full upright height measured from the top of the base plate; H1 is the height of the first beam level; HB is the beam level spacing.

Check Wide aisle Narrow aisle / VNA
Upright verticality Cx, Cz ±H/350 ±H/500
Aisle width deviation δE (near floor) ±15 mm ±5 mm
Clear entry width δA ±3 mm ±3 mm
First beam level δH1A (from base plate) ±10 mm ±7 mm
Other levels δH1 (from first level, greater of) ±5 mm or ±H1/500 Man-up: ±5 mm or ±H1/500 · Man-down: ±3 mm or ±H1/1000
Front-to-rear beam seating difference Hy ±10 mm ±10 mm
Upright straightness between beams Jx (greater of) ±3 mm or ±HB/400 ±3 mm or ±HB/750

Three things follow from this table that are worth understanding rather than memorising.

Verticality is proportional, not a fixed millimetre figure. A 12 m upright in a wide aisle may deviate ±34 mm over its full height; the same upright in a VNA aisle is limited to ±24 mm. Anyone quoting a single "maximum out-of-plumb" number without stating the height and aisle type is not quoting this standard.

Man-down VNA is held tighter than man-up. Where the operator stays at floor level and cannot see the top of the load, the standard halves the level tolerance and doubles the divisor. Automation and remote operation push tolerances tighter still — our AS/RS projects are held to crane-interface tolerances well inside these values.

The table contains no absolute full-height cap in millimetres, and we could not verify a frame diagonal tolerance from the published text. We do not invent one.

Note also what EN 15620:2021 excludes: rack-supported buildings, automated trucks, miniload and satellite (shuttle) systems, and — importantly — floor tolerances. Floor flatness is a separate specification; see our warehouse floor requirements guide.

Beam Deflection: Three Different Numbers

This is the most frequently misquoted figure in racking, so it is worth separating carefully.

Source Limit What it actually is
EN 15620:2021 §6.3.1 Table 3 L/200 Default where no special requirement is agreed; L is the upright centre distance
EN 15620:2021, additional ≤10 mm sagging Man-down VNA and levels above 6 m
ANSI/MH16.1 (RMI) L/180 A serviceability and perception consensus value, not a strength criterion
RMI guidance for AS/RS L/240 commonly Tighter for crane interface geometry
ApexBeam project default L/300 Our own stricter internal serviceability target

The distinction matters commercially. L/300 is not a value stated by EN 15512 or ANSI/MH16.1 — it is a tighter target we adopt. EN 15620's default is L/200, and the standard explicitly says limits should be agreed with the specifier for the project. RMI's L/180 is looser again and is about how a loaded beam looks and behaves, not about whether it is strong enough.

So when a competitor quotes "L/200 compliant" and we quote L/300, both statements can be true and they are not the same promise. Ask which standard, which edition, and whether the figure is a code default or a supplier target. We state ours as a supplier target.

Handover: What to Check Before You Sign

Installation quality is verifiable. Insist on measurement, not assurance.

Item Evidence to ask for
Upright verticality Measured readings per frame against ±H/350 or ±H/500 for your aisle type
Beam level elevations First level from base plate, then each level relative to the first
Aisle width Measured at floor level along each aisle, especially VNA
Anchor installation Type, size, embedment, edge distances, and torque records where the anchor ETA requires them
Beam connector engagement Locking pins or safety catches fitted at every connector
Bracing completeness Diagonal and horizontal bracing per the approved drawings, none omitted for access
Load notices Fitted, legible, in the local language, matching the engineered capacities
As-built drawings Reflecting any change made during installation
Damage baseline Photographic record of condition at handover

That last row is underrated. A dated photographic baseline makes every later damage dispute tractable: it establishes what was handed over, so subsequent dents cannot be attributed to installation.

We provide installation supervision and can arrange third-party inspection. We do not self-certify the installation as compliant with a standard we did not write — the measurements are the evidence, and an independent inspector can verify them.

EN 15635: Duties That Transfer to the Owner

EN 15635 is where responsibility moves to you. Its core requirements are unambiguous.

Appoint a PRSES. The standard defines the Person Responsible for the Safety of Storage Equipment as "person appointed by the warehouse management with responsibility for maintaining the safe operation of the warehouse storage system". Clause 8.1.1 requires the user to appoint that person and make the name known. This is a named individual, not a department.

Report damage immediately. Clause 8.4.2 requires damage to be reported to the PRSES as soon as it is identified. Not at the next scheduled inspection.

Inspect at two levels. Routine visual inspection by trained internal staff, plus expert inspection by a technically competent person at intervals not exceeding 12 months. SEMA's published guidance sets the routine frequency as weekly, or at other intervals based on risk assessment. The 12-month expert interval is consistent across independent sources; we could not read the clause number directly, so we cite it as the established interval rather than a verbatim clause reference.

Keep records. Inspections, damage reports and remedial actions must be documented. An inspection that leaves no record is, in practice, indistinguishable from no inspection.

Display load notices. Clause 8.1.2 requires notices in a prominent position, in the language of the country, in a durable format. Content should state maximum loads together with any necessary load configurations.

For operations in Canada, these duties are reinforced by occupational health and safety legislation placing inspection and maintenance obligations on the employer — see our Canada market guide.

Damage Assessment: Green, Amber, Red

The traffic-light system is widely used and widely misattributed. Getting the attribution right matters if you are writing it into a safety procedure.

What the categories mean (SEMA published guidance):

Category Meaning Required action
Green Within damage limits Record and monitor at normal intervals
Amber Beyond limits, repair required Act as soon as possible; SEMA guidance indicates within 4 weeks; do not reload the affected location until repaired
Red Serious damage Unload immediately and isolate; do not use until repaired or replaced

Sources differ on whether Amber requires unloading or merely load reduction. Our reading is that you should follow the inspecting body's instruction for the specific case, and in all cases not reload the affected location before repair. Some inspection bodies also treat an unresolved Amber as escalating to Red after 28 days.

The quantitative limits — and their real source. UK inspection bodies publish the following as SEMA damage tolerances:

Element Published limit
Upright, cross-aisle direction ≤3 mm bow over a 1 m measuring length
Upright, down-aisle direction ≤5 mm bow over a 1 m measuring length
Bracing member ≤10 mm in either plane
Beam, deflection under load ≤span/200
Beam, permanent set after unloading ≤span/1000

Two honest qualifications, and they are not optional.

First, these figures come from SEMA guidance as published by inspection bodies — not from EN 15635 itself. EN 15635 does contain the Green/Amber/Red concept, but its damage-limit annex is informative, and we could not verify millimetre values from the standard's public text. Attributing those millimetre values to the standard's own clauses would be a false citation. If your procedure must cite a standard, cite the concept to EN 15635 and the numbers to SEMA guidance, and obtain the current SEMA document.

Second, the bow limits apply to overall bending, not to local damage. A dent, tear, crease or local buckle is not assessed by measuring bow over a metre. Those defects generally require replacement regardless of the measured figure, because they compromise the section locally in a way a straightedge cannot capture.

This is also why our upright load check tool contains no damage allowance. It screens an undamaged section. A damaged upright is not a derated upright — it is an upright that needs assessment.

Why Moving a Beam Level Reduces Capacity

Warehouse teams adjust beam heights constantly to suit changing stock. This is the most common way a correctly designed rack becomes an unsafe one.

An upright's compression capacity depends on its unbraced length. Beam levels brace the upright in the down-aisle direction. Raise the first beam level, or increase the spacing between levels, and you lengthen the unbraced segment — which reduces capacity even though nothing was removed and no load was added.

EN 15635 states this directly. Note 2 to clause 7 reads: "if the height to the first beam level, or the spacing between beams, is increased, the safe load capacity of the frames will be reduced."

Clause 7 also requires that any modification be referred to the supplier or a specialist before work starts, that the rack be unloaded before modification, that no welding or bolting alterations be made without supplier approval, and that load notices be updated afterwards. Where back bracing is fitted, changing beam positions requires the bracing nodes to move with them.

The practical rule for a warehouse: a beam height change is a structural change. It needs the same approval as adding a level. Our worked upright example shows numerically how the down-aisle unbraced length governs the result.

Common Mistakes

1. Quoting Class 300 tolerances. The class system was removed in EN 15620:2021. Use the wide-aisle or narrow-aisle values directly.

2. Treating a deflection figure as a standard requirement without naming the source. EN 15620 defaults to L/200, RMI uses L/180, and L/300 is a supplier target. They are not interchangeable claims.

3. Accepting handover without measurements. Verticality, elevations and aisle width are measurable in an afternoon. Ask for the readings, not a statement of compliance.

4. No named PRSES. EN 15635 requires an appointed individual whose name is known. "The warehouse team" does not satisfy it.

5. Citing SEMA numbers as EN 15635 clauses. The concept is in the standard; the millimetre values are SEMA guidance. Attribute correctly or your procedure will not survive an audit.

6. Judging a dented upright with a straightedge. Bow limits address overall bending. Local dents, tears and buckles need replacement assessment, not measurement.

7. Raising beam levels to fit taller pallets. This reduces frame capacity and requires re-verification and updated load notices before the rack is used again.

FAQ

How out of plumb can a pallet rack upright be?

Under EN 15620:2021, verticality tolerance is ±H/350 for wide aisle and ±H/500 for narrow aisle, where H is the full upright height from the top of the base plate. There is no single millimetre answer — it scales with height. For a 12 m upright that is about ±34 mm and ±24 mm respectively.

How often must racking be inspected?

EN 15635 requires routine visual inspection plus expert inspection by a technically competent person at intervals not exceeding 12 months. SEMA guidance sets routine visual checks weekly, or at intervals determined by risk assessment. Both must be documented, and damage must be reported to the PRSES immediately when found.

What is the maximum acceptable damage to a rack upright?

UK inspection bodies publish SEMA limits of 3 mm bow over 1 m cross-aisle and 5 mm down-aisle. These apply to overall bending only — dents, tears and local buckles require replacement assessment regardless of measured bow. The figures are SEMA guidance, not EN 15635 clause values, and a technically competent person should make the call.

Can we move beam levels ourselves?

Not without approval. EN 15635 clause 7 requires modification to be referred to the supplier or a specialist first, the rack to be unloaded before work, and load notices updated afterwards. Increasing the first level height or the spacing between levels reduces frame capacity — this is stated explicitly in the standard.

What deflection limit should we specify?

Agree it explicitly. EN 15620:2021 defaults to L/200 where nothing special is agreed, with an additional 10 mm sagging cap for man-down VNA and levels above 6 m. RMI uses L/180. ApexBeam designs to a stricter L/300 target as our own standard, and tighter again where crane interfaces require it.

Related Products & Guides

Get an Engineered Layout & Quote

Send us your floor plan, pallet weights and dimensions, clear height and truck model. Our structural team returns a free layout drawing with load calculations, anchor specifications and the installation tolerances that apply to your aisle type — plus installation supervision and load notices on every project.

  • Email: sales@njapexbeam.com
  • Phone / WhatsApp: +86 185 1251 6598

Request an Engineered Layout & Quote

Send your floor plan, pallet dimensions and weights, clear height and SKU profile. Our structural team returns a free layout drawing with a load calculation within 24 hours.

sales@njapexbeam.com   +8618512516598

WhatsApp UsGet A Quote