😃 Key Factors of Pre-Embedment for Rack Supported Building (Self-Supporting Clad Rack, High Bay SILO): 😁
1. **Floor Preparation:**
- Ensure the concrete floor is fully cured and level.
- Verify floor thickness and compressive strength meet design specifications.
2. **Anchor Placement:**
- Mark exact positions for anchors based on the rack layout and manufacturer’s specifications.
- Use embedded anchor brackets or base plates fixed into the concrete with chemical or mechanical anchors.
- Anchors are usually placed before rack assembly to allow direct fixing of uprights.
3. **Types of Embedded Anchors:**
- Chemical anchors: Utilize epoxy resins to secure rods into drilled holes.
- Mechanical anchors: Sleeve or wedge anchors mechanically fixed by expansion inside drilled holes.
- Cast-in anchors: Embedded into fresh concrete before curing (common in new slab pours).
4. **Coordination with Rack Design:**
- Accurate measurements are critical to ensure anchors line up with rack bases.
- Embedment depth and positioning follow structural engineering guidelines for load transfer.
5. **Quality Control and Inspection:**
- Check alignment, level, and secure embedding before rack installation.
- Test pull-out strength if necessary for safety compliance.
6. **Protection and Finishing:**
- Anchors or embedded parts should be protected from corrosion.
- Ensure they are covered or sealed properly until racks are installed.